Part of Urban Drainage and Flood Control District’s plan to help with flooding included widening 1,000 LF of roadway and installing 1,300 LF of storm sewer. Improvements also included adding a 3-cell, 125 LF precast box culvert, head wall and wing walls, grouted boulder walls and one steel sheet pile grade sill.