A new 4,000 sq ft pre-engineered metal building with 4 vehicle storage bays, lounge, kitchenette, flex space, restrooms and showers. Site work entails adding a pump and water treatment system to service fresh water to the building, a leach field for the septic system, small detention pond, culverts, headwalls, inlet and outlet, approach pans, concrete pads, and an above ground diesel fueling station.