Taylor Kohrs partnered with Adams 12 Five Star Schools and 3890 Design to renovate Rocky Mountain Elementary School through the Adams 12 Bond Package E.
Rocky Mountain Elementary School upgrades included the art and music room renovations with installation of casework, new countertops, paint and interactive display boards. The PE spaces received new rubber gym flooring, sound system, operable partition wall, and cleaning of the existing stage curtain. Exterior renovations included demolition of timber walls and installation of drilled concrete piers and shotcrete wall. New stucco, doors, windows, and metal wall paneling gave a new look to the exterior of the school. Last, installation of bullet proof transaction windows, bullet resistant security film, and replacement of the access control panel was performed.